Colorado Archives - 91ԭƬ /tag/colorado/ K-12 + Higher Education Market Coverage Sat, 29 Aug 2026 21:26:41 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.5 /wp-content/uploads/2026/01/cropped-SCN_favicon-32x32.png Colorado Archives - 91ԭƬ /tag/colorado/ 32 32 Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý /2026/08/31/fast-tracking-the-future-how-mass-timber-and-p3-delivery-are-shaping-msu-denvers-summit-house/ Mon, 31 Aug 2026 15:19:22 +0000 /?p=55695 ConstructionÌýrecently topped outÌýonÌýMetropolitan State University of Denver'sÌý(MSU Denver)ÌýSummit House, a 12-story student housing development that marks the university's first on-campus residence hall in its 60-year history.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

]]>
As the tallest mass-timber structure in the state, the MSU Denver Summit House will also be a showcase for the design and construction advantages of this highly renewable building material. Photo Credit: SAR+ ArchitectsÌý

By Lindsey Coulter

ConstructionÌýrecently topped outÌýonÌýMetropolitan State University of Denver’sÌý(MSU Denver)ÌýSummit House, a 12-story student housing development that marks the university’s first on-campus residence hall in its 60-year history. Scheduled for completion inÌýsummerÌý2027, the approximately $118Ìýmillion mixed-use development will provideÌýmore thanÌý550 student beds, dining and retail space, and a permanent home for the university’s Classroom to Career Hub.ÌýÌý

Located on the Auraria CampusÌý(also shared with the Community College of Denver and University of Colorado, Denver) andÌýacross from Ball ArenaÌý(home to the Denver Nuggets and Colorado Avalanche sports teams), the project expands affordable housing whileÌýdemonstratingÌýhow mass timber construction can accelerate project delivery and enhance the student experience.

Making aÌýMass TimberÌýStatement

When complete,ÌýSummit HouseÌýwill be the tallest structure on the downtown-adjacentÌýtri-institutionalÌýcampus. As the tallest mass-timber structure in the state, it will also beÌýaÌýshowcaseÌýforÌýtheÌýdesign and constructionÌýadvantages ofÌýthis highly renewable building material.

Ryan Marshall, Superintendent forÌýproject builderÌýPCL Construction, noted that theÌýthoughtful use of mass timberÌýhelped accelerate construction, as manyÌýcomponents could beÌýfabricatedÌýoff siteÌýdown toÌýaÌý1/16-inchÌýtolerance.ÌýBy maximizing panel sizes, the designÌýrequires approximately 25 cross-laminated timber panels per residential floor, with the two podium levels composed of concrete.Ìý

Ìý“I’ve got to tip my hat to our architect and structural designer,Ìýbecause this project wasÌýreallyÌýdesigned around maximizing the capabilitiesÌýand efficienciesÌýof mass timber,” Marshall said.Ìý“”The width of the structure on the dormitory floors is 60 feet,Ìýwhich isÌýthe longestÌý[cross-laminated timber]Ìýpanel you can feasibly ship without it being an astronomical cost.ÌýIn turn,Ìýthat makes for a quick install,Ìýbecause it goes faster and you’re covering more area.”Ìý

While prefabrication speeds construction, itÌýalsoÌýrequiredÌýsignificantly more coordinationÌýwithÌýsupplierÌýMercer Mass TimberÌýduring design.Ìý

“Every penetration in the whole building had to be dialed in,” saidÌýMacy Huffaker, Project Architect with designer SAR+ Architects. “Every light fixture, every shaft, every dimension that they were making out of mass timber had to be locked in a lot earlier thanÌýitÌýwould on something that’sÌýsite built.”ÌýÌý

Martha Nelson, Director of Planning, Design andÌýConstruction for MSU Denver, noted that mass timber wasÌýa good choiceÌýfor helping meet the project’sÌýtimeline andÌýsustainabilityÌýgoals, but also for enhancing student experience, campus identity, marketÌýdifferentiationÌýand long-term institutional value.ÌýÌý

“The most important decision wasn’t choosing mass timber; it was understanding how student housing could advance MSU Denver’s mission to provide a high-quality, accessible and enriching education. Mass timber became one of the ways we delivered on those institutional goals in a sustainable and cost-effective way,â€� Nelson said.

“There’s plenty of data showing that students who live on campus perform better academically and stay enrolled at higher rates than those who commute,” added Ben DiazÌýSenior Development Manager withÌýColumbia Ventures, which serves as the project’sÌýdeveloper.Ìý“We’re proud to bring students for a true on-campus college experience, and we hope this project is the first of manyÌý—Ìýhelping shift the Auraria campus from a commuter campus to an active, live-in community that blurs the line between downtown and the university.â€�ÌýÌý

Solving Urban ConstructionÌýChallenges

While mass timber and early collaborationÌýhelpedÌýaccelerate the building’s timeline, constructingÌýa large-scaleÌýresidence hallÌýjustÌýoffÌýdowntown DenverÌýrequiredÌýcareful logistical planning.

“One thing that was definitely a concern when I got the project wasÌýfiguringÌýout if a 60-foot panel could make its way into downtown Denver,” Marshall said. “Just making turns and pulling in can be a challenge.”

Getting all materials to the project site required a significant level of planning, including run-throughs with 60-foot semis and coordination with trucking companies that understood the limitations of oversized loads. The team also head to adhere to curfews enforced within the city limits, which prevented deliveries during rush-hour traffic periods.

Delivering Through Partnership

Innovation and creative problem solving was a theme for the project even down to the funding mechanisms. Columbia Ventures, which serves as the project’s developer, partnered with the Auraria Higher Education Center and MSU Denver on this public-private partnership (P3) structure, which leveraged Auraria’s unique P3 statutory authority that helped accelerate project delivery.ÌýÌý

“From a P3 perspective, we could move at a pace and cost structure that’s hard to achieve through traditional public procurement,â€� said Diaz. “That let us release work quicker and often at a more competitive negotiated rate.â€�Ìý

This strategy was one reason the project was able to moveÌýfrom concept to groundbreaking inÌýjustÌýeight months, which Diaz said is notable for a P3 projectÌýwith multiple stakeholdersÌýand goalsÌýhappeningÌýon such a dynamic campus.ÌýÌý

“Part of our successÌýhere was MSU Denver’s commitmentÌýtoÌýthe project,â€� Diaz said.Ìý“We would not have been able to make itÌýatÌýthat pace without their support in this execution methodology.”

Read more about the project in the Design & Construction issue of 91ԭƬ, available now.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

]]>
Designing for Belonging: A Conversation with Dr. Drew Coleman /2026/08/11/designing-for-belonging-a-conversation-with-dr-drew-coleman/ Tue, 11 Aug 2026 18:29:38 +0000 /?p=55566 For Dr. Drew Coleman, Chief of Schools at Jeffco Public Schools, the physical environment is an important — and sometimes overlooked — part of that experience.Ìý

The post Designing for Belonging: A Conversation with Dr. Drew Coleman appeared first on 91ԭƬ.

The post Designing for Belonging: A Conversation with Dr. Drew Coleman appeared first on 91ԭƬ.

]]>
Dr. Drew Coleman provided the keynote speech at the recent 91ԭƬ Design & Construction Symposium.

By Lindsey CoulterÌý

The event was sponsored by the Colorado Mass Timber Association, McGrory Glass and Acorn Engineering.
The event was sponsored by the Colorado Mass Timber Association, McGrory Glass and Acorn Engineering.

A school building is more than the backdrop for education. It is where students develop relationships, teachers build community and young people begin to understand their place in the world. For Dr. Drew Coleman, Chief of Schools at Jeffco Public Schools, the physical environment is an important — and sometimes overlooked — part of that experience.Ìý

At the recent 2026 91ԭƬ Design + Construction Symposium, Coleman served as the keynote speaker. In his presentation, “Building Belonging: Designing Schools Where Students Feel Safe Enough to Learn and Prepared Enough to Lead,â€� Coleman examined how school environments can support belonging,ÌýsafetyÌýand student success.ÌýThe symposium brought together education leaders and the A/E/C community to explore the trends, challenges and projects shaping K-12 and higher education facilities.Ìý

In advance of the event, 91ԭƬÌý(SCN)Ìýspoke with Coleman about his path from classroom teacher to district leader, what he has learned about the relationship between physical spaces and student outcomes, and why designingÌý—Ìýor redesigningÌý—Ìýa school should begin with how the people inside it experience that space.Ìý

SCN: What initially drew you to education?Ìý

Coleman:ÌýI believe educationÌýis a great equalizer. I had an awesome educational experience, with parents who viewed public education asÌývery importantÌýand educators who invested in me. They pushed me academically, challenged me throughÌýactivitiesÌýand helped me build character.Ìý

I went into public education wanting to ensure that other people hadÌýthatÌýsame experience.ÌýI realized my experience wasn’t the experience of all of my friends and counterparts, so I wanted everyone else to have that same opportunity.Ìý

SCN: How did your classroom experience shape the way you think about learning environments?Ìý

Coleman:ÌýOnce I became a teacher, I realized education was more than putting standards and information in front of students.ÌýStudents have to understand that we care about them.Ìý

I taught in Title I schools and some of our most impoverished schools, where buildings were oftenÌýoldÌýand classroomsÌýhadn’tÌýreceived much investment. I wanted my students to have the kind of experience I had, so I invested in my own classroom.Ìý

A college professor once told me, “Your classroom should make your students feel like home.â€� I created little nooks andÌýreadingÌýcorners with a couch and bookshelf. I would put a lamp there. It was about reminding students what reading could be like and creating a space where they felt comfortable.Ìý

SCN: What have you learned about the relationship between belonging, the physicalÌýenvironmentÌýand student success?Ìý

Coleman joined fellow speaker Micah Ali, President of the Compton Unified School District board.
Coleman joined fellow speaker Micah Ali, President of the Compton Unified School District board.

Coleman:ÌýWhen a leader creates a sense of belonging, educators take pride in their space.ÌýI’veÌýworked in old buildings where educators were given the ability to make modifications and updates to their classrooms. They made their classrooms their own.Ìý

ThatÌýtranslatedÌýto the students. They took ownership and pride in their classrooms, too.ÌýWhen students feel safe, feel like they belong and feel like they matter, it makes a difference.ÌýI’veÌýseen thatÌýreflected inÌýacademic outcomes.Ìý

TheÌýflip sideÌýis also true. If students walk into an old building where paint is chipping off the walls and theyÌýdon’tÌýhave spaces that feel uniquely theirs, that has an emotional and mental impact on how they view education and learning. It also affects how they perceive how adults feel about them.Ìý

SCN: Does creating that environment always require a new building or major capital investment?Ìý

Coleman:ÌýNo. I know money and finances are difficult for most schools and districts. New, innovative buildings are great, butÌýit’sÌýalso about how we reimagine our currentÌýspacesÌýso they align with 21st-century learning and what students need.Ìý

You can take an old home and fix it up on the inside. The same thing applies to schools. ItÌýisn’tÌýnecessarily about the neighborhood or location of the building.ÌýIt’sÌýabout how we make the building and how we make students feel.Ìý

If students don’t feel they matter or don’t have a sense of belonging, it shows up in their academic outcomes and their behavior data.Ìý

SCN: How has your expanded role in safety and security changed how you think about the built environment?Ìý

Coleman:ÌýSafety and securityÌýisÌýa unique space. There is the physical safety of the building—making sure we have the technical things inÌýplaceÌýso buildings are physically secure and feel safe. In Jeffco,Ìýwe’veÌýdone an extremelyÌýgood jobÌýensuring that our buildings have that sense of physical safety.Ìý

ButÌýthere’sÌýalso a sense of safety and belonging. A building can be physically safe, but there can still be people in our communities whoÌýdon’tÌýfeel safe.Ìý

That’sÌýwhy listening is so important. WeÌýhave toÌýask, “If you don’t feel safe, what would make you feel safe?â€�ÌýThen we have to determine what we can actually do.Ìý

SCN: What do you hope attendeesÌýtookÌýaway from your symposium keynote?Ìý

Coleman:ÌýWhat we do in K-12 education is going to be so important, especially as we think about the next generation and what happens after high school. What we do in our schools makes a difference.Ìý

WhenÌýwe’reÌýable to create an environment where students really feel that they belong,Ìýwe’reÌýable to decrease the dropout rate and increase the graduation rate.Ìý

The spaceÌýmatters. It matters more than people sometimes realize.Ìý

That’sÌýwhy conversations between educators and the design and construction community are so important. Educators understand what students and teachers experience every day. Architects,ÌýengineersÌýand contractors bringÌýexpertiseÌýabout what is possible within the built environment. When those perspectives come together early and thoughtfully, we have an opportunity to create spaces that don’t just lookÌýgood, butÌýactually support the people who use them.Ìý

The post Designing for Belonging: A Conversation with Dr. Drew Coleman appeared first on 91ԭƬ.

The post Designing for Belonging: A Conversation with Dr. Drew Coleman appeared first on 91ԭƬ.

]]>
Rafael Murillo Joins Denver Office of NBBJ /2026/06/05/rafael-murillo-joins-denver-office-of-nbbj/ Fri, 05 Jun 2026 15:08:53 +0000 /?p=55045 Rafael Murillo,ÌýAICP, WELL AP,Ìýrecently joinedÌýthe Denver office ofÌýNBBJ as a Senior Campus Designer/Planner.Ìý

The post Rafael Murillo Joins Denver Office of NBBJ appeared first on 91ԭƬ.

The post Rafael Murillo Joins Denver Office of NBBJ appeared first on 91ԭƬ.

]]>
Rafael Murillo,ÌýAICP, WELL AP,Ìýrecently joinedÌýthe Denver office ofÌýNBBJ as a Senior Campus Designer/Planner.ÌýPreviously, he was a Senior Planner and Associate with SmithGroup, focused on higherÌýeducation, prior to which he worked with SAR+ Architects, where he focused on mixed-use and urban environments. Earlier in his career, Murillo worked with the Seattle office of NBBJ as anÌýExperienceÌýDesigner.ÌýHe has completed projects forÌýKansas State University,ÌýColorado State University, the University of Texas,ÌýIdaho State University, and the University of California system. HeÌýreceived his master’s degree in urban planning and landscape architecture from the University of Washington.

The post Rafael Murillo Joins Denver Office of NBBJ appeared first on 91ԭƬ.

The post Rafael Murillo Joins Denver Office of NBBJ appeared first on 91ԭƬ.

]]>
Adams 12 Five Star Schools Breaks Ground on New Thornton High School to Support Career and Technical Education Pathways /2026/06/02/adams-12-five-star-schools-breaks-ground-on-new-thornton-high-school-to-support-career-and-technical-education-pathways/ Tue, 02 Jun 2026 15:04:32 +0000 /?p=55030 Adams 12 Five Star Schools celebrated the official groundbreaking for the new Thornton High School on Tuesday, May 19, marking a major milestone in the district’s voter-approved 2024 bond program and the future of one of the district’s longest-standing high school communities.Ìý

The post Adams 12 Five Star Schools Breaks Ground on New Thornton High School to Support Career and Technical Education Pathways appeared first on 91ԭƬ.

The post Adams 12 Five Star Schools Breaks Ground on New Thornton High School to Support Career and Technical Education Pathways appeared first on 91ԭƬ.

]]>
Construction begins this month and will be completed in phases, allowing Thornton High School to continue serving students while the new building is constructed. | Photo Credit (all): Treanor

THORNTON, Colo. — Adams 12 Five Star Schools celebrated the official groundbreaking for the new Thornton High School on Tuesday, May 19, marking a major milestone in the district’s voter-approved 2024 bond program and the future of one of the district’s longest-standing high school communities.Ìý

The first wing of the new school is scheduled to open in summer 2028.
The first wing of the new school is scheduled to open in summer 2028.

“Today’s groundbreaking is about honoring history, while looking ahead to new chapters,â€� said Thornton High School Principal Charles Arellano, a Thornton High alumnus, according to a statement from the district. “The new Thornton High School will create new opportunities for students and staff and will also carry over the pride, the relationships and the rich traditions that make the school so special.â€�Ìý

The new Thornton High School is one of the core projects included in the district’s 2024 bond, which was approved by voters to support investments in schools throughout the district.Ìý

Construction begins this month and will be completed in phases, allowing Thornton High School to continue serving students while the new building is constructed. The first wing of the new school is scheduled to open in summer 2028. The second wing is scheduled to be completed in winter 2029, with the completed building ready for students in fall 2030.Ìý

The project will replace the existing Thornton High School with a modern learning environment designed to support current and future students while honoring the school’s history and deep community ties. Student leaders from Thornton Elementary, a Thornton High feeder school, alsoÌýparticipatedÌýin the ceremony,ÌýrepresentingÌýfuture Trojans who could be among the first students to attend the fully completed new school.Ìý

On the project website, Treanor noted that the design team listened closely to what project stakeholders loved, hoped for and felt was missing from the current Thornton High School facility. That feedback ultimately shaped the design. Ìý

“What’sÌýemerged is not just a school but a cultural hub: a welcoming, inclusive space that honors tradition and fosters innovation,â€� the firm said.Ìý“Together,Ìýwe’reÌýcreating a place of pride that honors the school’s rich heritage and paves the way for a bold, bright future.â€�Ìý

From open, light-filled spaces that invite collaboration toÌýfeaturesÌýthat promote academic growth, student confidence,ÌýaccessibilityÌýand wellness, the new THS is designed to support the whole student.ÌýÌý

The design was intentionally developed to supportÌýsixÌýcoreÌýcareer and technical education (CTE)Ìýpathways:ÌýÌý

  1. Advanced Manufacturing
  2. Media Arts and Entertainment
  3. Computer Science and Digital TechnologyÌý
  4. Culinary and Consumer Science
  5. Business and Entrepreneurship
  6. Interpretation and Translation Services

TheseÌýeducational pathwaysÌýareÌýwoven into the layout, creating opportunities forÌýhands-on learning spaces where students explore real-world skills and discover their passions, according to Treanor.ÌýThe new curriculum is designed to accommodate the full spectrum of students who attend THS, including thoseÌýseekingÌýto build skills and enter the workforceÌýimmediatelyÌýafter graduation, as well as students planning to pursue higher education.ÌýÌý

The project team also includes Accenture and Adolfson & Peterson Construction.Ìý

The post Adams 12 Five Star Schools Breaks Ground on New Thornton High School to Support Career and Technical Education Pathways appeared first on 91ԭƬ.

The post Adams 12 Five Star Schools Breaks Ground on New Thornton High School to Support Career and Technical Education Pathways appeared first on 91ԭƬ.

]]>
Joel Williams on Leading QKA’s New Colorado Office and Taking on a New K-12 Market /2026/05/26/joel-williams-on-leading-qkas-new-colorado-office-and-taking-on-a-new-k-12-market/ Tue, 26 May 2026 15:35:17 +0000 /?p=55005 Led by Studio Director Joel Williams, AIA, LEED AP, ALEP, the team also includes Project Designers Joseph Puyot and Spencer Robinson.Ìý

The post Joel Williams on Leading QKA’s New Colorado Office and Taking on a New K-12 Market appeared first on 91ԭƬ.

The post Joel Williams on Leading QKA’s New Colorado Office and Taking on a New K-12 Market appeared first on 91ԭƬ.

]]>
By Lindsey CoulterÌý

The architecture firm Ìý—ÌýwithÌýofficesÌýin Santa Rosa, Calif.,Ìýand Oakland,ÌýCalif. —Ìýrecently advancedÌýit’sÌý2030 vision byÌýestablishingÌýan office in Castle Rock, Colo.ÌýTheÌýnearly 80-personÌýfirm now has three employees in ColoradoÌýsupportingÌýprojects across the company andÌýas theyÌýlook to build a strategic pipeline of opportunities inÌýthe region.ÌýLed by Studio Director JoelÌýWilliams,ÌýAIA,ÌýLEED AP, ALEP,Ìýthe team also includesÌýProjectÌýDesigners Joseph Puyot and Spencer Robinson.Ìý

Williams joinedÌýQKA in 2020ÌýandÌýhas more than 18 years of experience in education design, fromÌýsmall classroom renovations to large-scale campus master planning projects. With a leadershipÌýstyle rooted in collaboration andÌýcommunication,Ìýhe will build on his established client andÌýpartner relationships to grow QKA’s presence in the Rocky Mountains.ÌýÌý

“ThisÌýexpansion is a natural extension of our community-minded work inÌýCalifornia andÌýoffers greatÌýopportunities to build our talent pipeline in aÌýhighly desirableÌýregion to live and work,â€� Williams said.Ìý

Williams, who will also share his insights at the 91ԭƬ (SCN)ÌýDesign & Construction SymposiumÌýin August, spoke recently with SCN to explain why Colorado is a compelling market for K-12 design, and how architecture can help schools do more with limited resources.Ìý

SCN:ÌýColorado has seen significant growth and voter support for school bonds. How do you see those market conditions shaping the next generation of school design in the state?Ìý

Williams:ÌýColorado voters approvedÌýnearlyÌý$6 billionÌýin new school bond funding in the 2024 election cycle, withÌýadditionalÌýmeasuresÌýanticipatedÌýon the 2026 ballot. That sustained community investment reflects the same convictionÌýwe’veÌýseen across the Bay Area: that well-designed schools are worth funding, and that communities willÌýbackÌýthat commitment at the ballot box.Ìý

The policy landscape is similarly aligned. Evolving energy codes in both states are driving demand for schools that prioritize efficiency, renewable generation, and reduced fossil fuel reliance. Sustainability strategies that were once aspirational—daylighting, natural ventilation, solar generation, stormwater management—are now baseline expectations in both markets. The frontier of the conversation has moved upstream, from operational energy use to the embodied carbon inherent in the materials and processesÌýrequiredÌýto build and renovate in the first place.ÌýÌý

The key distinction between the two markets is demographic. California enrollment isÌýlargely stableÌýor slightly declining, while Colorado’s population growth is driving enrollment increases and expanding housing development across the region. That translates into demand for both new campuses and significant modernization of existing ones.Ìý

SCN:ÌýMany districts are balancing enrollment growth, aging infrastructure, and budget pressure. How can architecture help schools do more with limited resources?Ìý

Williams:ÌýThere is no universal answer to the gap between funding andÌýneedÌýthat every public school district faces. Sometimes a creative renovation is the right investment; sometimes demolition and replacement of an aging facility is the better long-term decision. What matters is that the solution fits the place.Ìý

In every case, the goal is the same: buildings that meet today’s needs whileÌýremainingÌýadaptable, and that incorporate systems district facilities staff canÌýactually operateÌýand maintain effectively. Architecture helps schools do more with limited resources whenÌýit’sÌýrigorous about long-term cost of ownership, not just first cost—and whenÌýit’sÌýhonest about which investments will still be paying dividends in 20 or 30 years.Ìý

SCN:ÌýColorado districts vary widely—from fast-growing suburban systems to rural communities. How should education design adapt toÌývery differentÌýlocal needs rather than relying on one-size-fits-all solutions?Ìý

Williams:ÌýEvery project starts with active listening. Before we reach for a solution, we work to understand what a particular district, campus, and community actuallyÌýneed. We have decades of experience in school design, but we focus more on bringing thatÌýexpertiseÌýto creatively respond to a client’s goals than on telling them what they should think. The best designs respond to the constraints that make a school community and site unique—not necessarily those with the largest footprint or the biggest budgets. Across a state as varied as Colorado, that postureÌýisn’tÌýoptional;Ìýit’sÌýthe only approach that works.Ìý

SCN:ÌýYou bringÌýnearlyÌý20Ìýyears of education design experience. What are the biggest shiftsÌýyou’veÌýseen in learning environments over that time, and how will those lessons influence your Colorado work?Ìý

Williams:ÌýThe biggest shiftsÌýhaven’tÌýbeen in classroom layout or building configuration;Ìýthey’veÌýcome from the systems, technology, and construction methods that make schools workÌýover time. As I mentioned previously, this isÌýapparentÌýin the shift in prioritiesÌýregardingÌýsustainability strategies. As certain strategies become the baseline, we can move toÌýfocusingÌýmore on concerns like embodied carbon.ÌýÌý

That whole-lifecycle thinking, developed through years of California work, is a direct asset as Colorado districts make long-term infrastructure decisions. Our Colorado presenceÌýisn’tÌýdesigned to function as a stand-alone regional office; the vision is a distributed studio model—one firm,ÌýoperatingÌýacross multiple geographies, carrying the same design standards, technical rigor, and culture that have defined QKA for four decades. For Colorado districts, that means access not just to a local team, but to the full depth of QKA’s institutional knowledge, built project by project, district by district, over 40 years.Ìý

The post Joel Williams on Leading QKA’s New Colorado Office and Taking on a New K-12 Market appeared first on 91ԭƬ.

The post Joel Williams on Leading QKA’s New Colorado Office and Taking on a New K-12 Market appeared first on 91ԭƬ.

]]>
Haxtun School District Breaks Ground on Unified PK–12 Campus /2026/05/20/haxtun-school-district-breaks-ground-on-unified-pk-12-campus/ Wed, 20 May 2026 15:49:14 +0000 /?p=54993 Haxtun School District RE-2J has begun construction on a renovation and addition project designed to unify its prekindergarten through 12th-grade campus and update learning spaces.ÌýÌý

The post Haxtun School District Breaks Ground on Unified PK–12 Campus appeared first on 91ԭƬ.

The post Haxtun School District Breaks Ground on Unified PK–12 Campus appeared first on 91ԭƬ.

]]>
The redesigned campus will improve wayfinding and strengthen connections between grade levels while creating dedicated spaces for early childhood education, specialÌýeducationÌýandÌýsensory-support programs. | Photo Credit: Courtesy of Wold Architects & Engineers
  • Haxtun School District RE-2J marked the start of construction May 13 on a renovation and addition project to unify its PK–12 campus.Ìý
  • The project follows several years of planning and is funded through a bond election and a Building Excellent Schools Today (BEST) grant awarded in May 2025.Ìý
  • Work includes reorganizing classrooms and support spaces, safety and operational upgrades, and new/repurposed nutrition and athletics areas.Ìý
  • Plans also call for replacing the district’s 1956 vocational agriculture building with a new facility supporting multiple agricultural programs.ÌýÌý
  • Construction is expected to be completed in July 2027 withÌýWoldÌýArchitects and Engineers, Bryan Construction and NV5 partnering on the project.Ìý

HAXTUN, Colo. — Haxtun School District RE-2J has begun construction on a renovation and addition project designed to unify its prekindergarten through 12th-grade campus and update learning spaces.ÌýÌý

District officials, staff,ÌýstudentsÌýand community members gathered May 13 for a groundbreaking ceremony following several years of planning and a funding package built on a successful bond election and a BEST grant award in May 2025.ÌýÌý

Superintendent Aron Jones said the project is intended to create a more connected campus that supports student learning and collaboration.ÌýÌý

“Our goal has always been to provide the best possible learning environment for our students,â€� said Superintendent Aron Jones. “By bringing our students and programs together in a more organized, connected environment, we’re creating a school that better supports learning, collaboration and day-to-day success.â€�Ìý

The project scope includes reshaping spaces that district officials said have been fragmented by multiple additions over time. Early childhood and kindergarten classrooms will beÌýconsolidatedÌýwith improved access to playgrounds, while special education and sensory spaces will be grouped together.ÌýÌý

The redesigned campus will improve wayfinding and strengthen connections between grade levels while creating dedicated spaces for early childhood education, specialÌýeducationÌýandÌýsensory-supportÌýprograms. The project also prioritizes safety through a more secure main entry sequence and improved organization of high-activity spaces such as athletics and physical education.ÌýÌý

A significant feature of the project includes repurposing the existing elementary gym into a centralized cafeteria serving the entire PK-12 population. In addition, the district will construct a new auxiliary gym with expanded seating and improved access to locker rooms and outdoor athletic facilities.ÌýÌý

Career and technical educationÌýisÌýanother focus. The district plans to replace its 1956 vocational agriculture building with a new facility intended for agricultural mechanics, welding, animalÌýscienceÌýand crop science programs.ÌýÌý

Construction is expected to conclude in July 2027.ÌýWoldÌýArchitects and Engineers partnered with Bryan Construction and owner’s representative NV5 to design and deliver the project, which willÌýconsolidateÌýpreviously fragmented facilities into a more connected and student-centered campus.Ìý

This article is based on reporting originally published byÌýColoradoBizÌýon May 14, 2026, and information posted by Haxtun School District RE-2J.Ìý

The post Haxtun School District Breaks Ground on Unified PK–12 Campus appeared first on 91ԭƬ.

The post Haxtun School District Breaks Ground on Unified PK–12 Campus appeared first on 91ԭƬ.

]]>
Right-Sizing Schools, Part II: Turning Enrollment Decline into Opportunity /2026/05/07/right-sizing-schools-part-ii-turning-enrollment-decline-into-opportunity/ Thu, 07 May 2026 22:16:22 +0000 /?p=54947 Public school systems across the country are entering a period of sustained enrollment decline, driven by a convergence of demographic and behavioral shifts, particularlyÌýevidentÌýalong Colorado’s Front Range.

The post Right-Sizing Schools, Part II: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

The post Right-Sizing Schools, Part II: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

]]>
At Sheridan High School, the design team revitalized an abandoned pool building into a trades skills workshop where students could work alongside trade professionals to develop hands-on skills in carpentry, plumbing, electrical and HVAC systems. | Photo Credit (all): Courtesy of Wold Architects & Engineers

By Greg CromerÌý

Public school systems across the country are entering a period of sustained enrollment decline, driven by a convergence of demographic and behavioral shifts, particularlyÌýevidentÌýalong Colorado’s Front Range.ÌýAs explained in Part I of this article, ColoradoÌýis projected to lose more than 15,000 children ages 0–17Ìýover the next five years, due to factors such asÌýpersistently low birth rates, high housing costs, an agingÌýpopulationÌýand slower immigration.Ìý

Online programs, private schools or homeschooling offer further competition for public schools across the country, helping to accelerate enrollment losses that exceeded 10,000 students this year alone, the largest drop since COVID-19. Ìý

Part I of this article discussed howÌýdecliningÌýenrollmentÌýacross the nationÌýis forcingÌýleaders to considerÌýconsolidation,ÌýclosuresÌýand replacement. However, this shift is alsoÌýcreatingÌýopportunitiesÌýto modernize aging facilities and rethink how space supports evolving educational models, from flexible, data-informed facility plansÌýto right-sizingÌýschool capacity through consolidation and reconfiguration. Read further recommendations here:Ìý

Establish Shared Understanding to Align Community and System NeedsÌý

Schools can consider repurposing underutilized wings into collaboration zones, student services or community spaces.
Schools can consider repurposing underutilized wings into collaboration zones, student services or community spaces.

Engaging communities in school closures or consolidation is one of the most challenging responsibilities for school boards because it sits at the intersection of personal impact and systemwide necessity. Families often focus on identity, commuteÌýchangesÌýand neighborhood stability, while districts must address enrollment decline, underused facilities, financialÌýpressureÌýand equity. Bridging this gap requires transparent, data-driven storytelling that connects individual decisions to broader trends while also acknowledging the real loss communities feel—an essential step inÌýmaintainingÌýtrust.Ìý

These decisions also require courage from district leaders, as delays or inaction can deepen inequities and strain limited resources. The transition also offers a powerful opportunity for community renewal by reimagining school identity through a new name, mascot,ÌýcolorsÌýor symbols, which allows architectural teams to embed that identity into the built environment and shape a unifying community asset.Ìý

Additionally, districts are increasingly designing schools for flexibility from the outset by positioning facilities as civic assets. Through adaptable layouts and coordinated shared-use spaces like flexible commons, gyms or auditoriums, schools can better serve both students and communities year-round, maximizing public investment and long-term value. This approach positions facilities not as static assets, but as adaptable infrastructure and dynamic tools that can continue to deliver student success and community buy-in.Ìý

UnlockÌýValue inÌýExistingÌýAssetsÌý

in response to shifting enrollment patterns, the Clara Brown Entrepreneurial Academy leaned into its identity rooted in entrepreneurship and innovation, using its programmatic focus to differentiate itself and re-engage families.
In response to shifting enrollment patterns, the Clara Brown Entrepreneurial Academy leaned into its identity rooted in entrepreneurship and innovation, using its programmatic focus to differentiate itself and re-engage families.

Reframing existing school assets is a key strategy for districts facing enrollment decline and unevenÌýutilization, shifting underused schools from excess capacity to flexible hubs that can be repurposed to meet emerging needs. Converting space for early childhood education, expanding special education or alternative programs, co-locating community services and even exploring workforce housing to support educator recruitment and retention can make an impact. Alongside physical reuse, specialized models such as STEM, Career and Technical Education (CTE) or arts-focused programs can also re-energize underenrolled facilities by drawing students across traditional boundaries.Ìý

Partnering with architecture and design firms can help reimagine and maximize the value of existing assets. Consider repurposing underutilized wings into collaboration zones, studentÌýservicesÌýor community spaces. At Sheridan High School, the design team revitalized an abandoned pool building into a trades skills workshop where students could work alongside trade professionals to develop hands-on skills in carpentry, plumbing, electrical and HVAC systems.Ìý

Districts such as Aurora Public Schools are leaning into programmatic strategies to attract andÌýretainÌýstudents in a competitive enrollment landscape. As choice expands and demographic pressures intensify, districts are moving beyond boundary-based enrollment to emphasize what makes each school distinct. This includes developing and branding focus-based schools built around themes, specializedÌýprogrammingÌýor community partnerships to create a clear value proposition for families. For example, in response to shifting enrollment patterns, the Clara Brown Entrepreneurial Academy leaned into its identity rooted in entrepreneurship and innovation, using its programmatic focus to differentiate itself and re-engage families.Ìý

Designing forÌýconsolidation and future repurposing is essential to creating resilient school environments that attract andÌýretainÌýstudents. Flexibility helps future-proof facilities against demographic shifts, fundingÌýchangesÌýand broader disruptions, enabling districts to respond to enrollment changes without stranded assets and keeping buildings relevant and impactful over time.Ìý

Greg Cromer is an education practice leader atÌýWoldÌýArchitects and Engineers with more than 40 years of experience designing K–12 learning environments. He can be reached via email atÌýgcromer@woldae.com.Ìý

Get more weekly reports andÌýtimelyÌýupdates by subscribing for free atÌýschoolconstructionnews.com/subscribe.Ìý

The post Right-Sizing Schools, Part II: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

The post Right-Sizing Schools, Part II: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

]]>
Right-Sizing Schools, Part I: Turning Enrollment Decline into Opportunity /2026/05/04/right-sizing-schools-part-1-turning-enrollment-decline-into-opportunity/ Mon, 04 May 2026 15:18:18 +0000 /?p=54940 Public school systems across the country are entering a period of sustained enrollment decline, driven by a convergence of demographic and behavioral shifts, particularlyÌýevidentÌýalong Colorado’s Front Range.

The post Right-Sizing Schools, Part I: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

The post Right-Sizing Schools, Part I: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

]]>
Riverview PK-8 School is one of several recent projects that reflects a broader shift toward right-sizing facilities while maintaining neighborhood access to education. | Photo Credit (all): Courtesy of Wold Architects & Engineers

By Greg Cromer

Rather than defaulting to replacement, districts are rethinking aging assets and are prioritizing renovation and adaptive reuse to better match capacity with current and projected enrollment.
Rather than defaulting to replacement, districts are rethinking aging assets and are prioritizing renovation and adaptive reuse to better match capacity with current and projected enrollment.

Public school systems across the country are entering a period of sustained enrollment decline, driven by a convergence of demographic and behavioral shifts, particularlyÌýevidentÌýalong Colorado’s Front Range. Over the next five years, the state is projected to lose more than 15,000 children ages 0–17, as persistently low birth rates, high housing costs, an agingÌýpopulationÌýand slower immigration reduce the number of school-aged students.Ìý

With more families considering online programs, private schools or homeschooling, public schools across the country are facing declines in student enrollment, accelerating enrollment losses that exceeded 10,000 students this year alone, the largest drop since COVID-19. According to projections from the National Center for Education Statistics, this downward trend is expected to continue nationally, placing increasing pressure on district funding, staffing and long-term planning, especially in high-poverty communities where per-pupil revenue is critical.Ìý

Within this challenge lies a strategic inflection point: declining enrollment is forcing long-delayed conversations around consolidation,ÌýclosuresÌýand replacement, while simultaneously creating an opportunity to modernize aging facilities and rethink how space supports evolving educational models. As some districts grapple with underutilized buildings and shifting community needs, the question is no longer whether change is necessary, but how to approach it. Below are strategies to unlock strategic investment in existing assets, align facilities with evolving educational programs and position schools to attract andÌýretainÌýstudents in a more competitive, choice-driven landscape.Ìý

  1. Build flexible, data-informed facility plans

At Peakview Academy at Conrad Ball, declining enrollment prompted consolidation efforts, with Thompson School District merging a middle school and two elementary schools into a new schools into a new PK–8 campus designed to better align staffing, programming and enrollment needs.
At Peakview Academy at Conrad Ball, declining enrollment prompted consolidation efforts, with Thompson School District merging a middle school and two elementary schools into a new schools into a new PK–8 campus designed to better align staffing, programming and enrollment needs.

In neighborhoods with aging populations, schools areÌýoperatingÌýbelow capacity, prompting consolidation or closure, while growth areas on the urban fringeÌýand inÌýredeveloping corridors face rising demand and need targeted expansion. This divergence is pushing districts toward more nuanced, data-driven strategies that balance right-sizing in legacy neighborhoods with growth planning elsewhere.Ìý

To respond, districts are adopting more disciplined, long-range planning approaches that integrate enrollment projections, birth rates, housing trends and migration patterns with facility condition,ÌýcapacityÌýand educational adequacy data. Financial modeling grounded in per-pupil revenue forecasts and capital funding scenarios helps weigh renovation versus replacement, while scenario planning prepares districts for shifting demographic and policy conditions. Paired with transparent, community-informed engagement, this approach enables districts to move beyond reactive decisions and build flexible roadmaps that align facilities with evolving programs,ÌýoptimizeÌýexisting assets and support long-term sustainability.Ìý

  1. Right-size school capacity through consolidation and reconfiguration

Many schools were built during the post–World War II boom (1950s–70s), with a second wave in the 1990s–early 2000s tied to suburban growth. As a result, much of the portfolio, especially in establishedÌýdistricts,ÌýisÌýnow 45 to 65 years old, with some buildings exceeding 70 and requiring significant modernization. While newer schools exist in growth areas, portfolios areÌýlargely definedÌýby older campuses in mature neighborhoods and newer ones on the fringe. This imbalance is driving complex capital decisions, as districts weigh modernization against replacement amid declining or uneven enrollment.Ìý

Rather than defaulting to replacement, districts are rethinking aging assets and are prioritizing renovation and adaptive reuse to better match capacity with current and projected enrollment. AtÌýPeakviewÌýAcademy at Conrad Ball, declining enrollment prompted consolidation efforts, with Thompson School District merging a middle school and two elementary schools into aÌýnew schoolsÌýinto a new PK–8 campus designed to better align staffing,ÌýprogrammingÌýand enrollment needs. Similar models, including High Plains School and Riverview PK-8 School, reflect a broader shift toward right-sizing facilities whileÌýmaintainingÌýneighborhood access to education.Ìý

This approach supports more strategic capital investment, reduces long-term maintenanceÌýcostsÌýand improves operational efficiency while enabling evolving instructional models. ByÌýconsolidatingÌýunderused facilities and reconfiguring grade structures, districts can better balance educational quality with fiscal responsibility, transforming aging infrastructure into more sustainable, future-ready learning environments.Ìý

Stay tuned for Part II of this article later this week, focused on establishing shared understanding to align community and system needs and how to unlock value in existing assets.

Greg Cromer is an education practice leader atÌýWoldÌýArchitects and Engineers with more than 40 years of experience designing K–12 learning environments. He can be reached via email atÌýgcromer@woldae.com.Ìý

Get more weekly reports andÌýtimelyÌýupdates by subscribing for free atÌýschoolconstructionnews.com/subscribe.Ìý

The post Right-Sizing Schools, Part I: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

The post Right-Sizing Schools, Part I: Turning Enrollment Decline into Opportunity appeared first on 91ԭƬ.

]]>
Colorado State University Tops Out Advanced Technology Lasers for Applications and Science /2026/04/27/colorado-state-university-tops-out-advanced-technology-lasers-for-applications-and-science/ Mon, 27 Apr 2026 19:17:57 +0000 /?p=54917 Colorado State University marked a major construction milestone April 24 with a topping-out ceremony for the Advanced Technology Lasers for Applications and Science, or ATLAS, Facility, a project officials say will become one of the world’s most advanced laser research centers.Ìý

The post Colorado State University Tops Out Advanced Technology Lasers for Applications and Science appeared first on 91ԭƬ.

The post Colorado State University Tops Out Advanced Technology Lasers for Applications and Science appeared first on 91ԭƬ.

]]>
When complete, the ATLAS Facility is expected to house one of the most powerful laser systems in the world, supporting research in fusion energy, medicine and fundamental science. | Photo Credit (all): Courtesy of McCarthy Building Companies
  • Colorado State University held an April 24 topping-out ceremony for the ATLAS Facility, a two-story laser research building on the Foothills Campus.
  • The project team completed the structural steel frame for the 77,626-square-foot facility, with participants signing the final beam before placement.
  • The $150 million public-private partnership includes CSU and Marvel Fusion, with additional support from the U.S. Department of Energy and other sources.
  • Substantial completion is scheduled for December 2026, and the university anticipates an official opening in 2027.
  • The specialized interior build-out will include cleanrooms and vibration-sensitive labs designed for high-performance laser research.

FORT COLLINS, Colo. — Colorado State University marked a major construction milestone April 24 with a topping-out ceremony for the Advanced Technology Lasers for Applications and Science, or ATLAS, Facility, a project officials say will become one of the world’s most advanced laser research centers.Ìý

The event recognized completion of the structural steel frame for the two-story, 77,626-square-foot building now rising on the university’s Foothills Campus near the Department of Atmospheric Science building. During the ceremony, faculty,ÌýstudentsÌýand staff were invited to sign the final beam before it was placed atop the structure, a longstanding construction tradition symbolizing progress and safety.Ìý

“As the United States works to lead in areas like fusion energy and directed-energy technologies, facilities like this are essential,� said Cassandra Moseley, Vice President for Research at CSU. “ATLAS will serve as a critical testbed, bringing together academia, industry and government to accelerate innovation, strengthen energy security and ensure our competitiveness on a global stage. I’m grateful for our industry and federal partners who have been — and will be critical in making this vision for scientific progress a reality.

When complete, the ATLAS Facility is expected to house one of the most powerful laser systems in the world, supporting research inÌýfusionÌýenergy,ÌýmedicineÌýand fundamental science. University leaders have said the project is intended to position Colorado State as a global hub for next-generation laser science and related technologies.Ìý

Gov. Jared Polis attended the topping out ceremony and signed the ceremonial beam.
Gov. Jared Polis attended the topping out ceremony and signed the ceremonial beam.

The project is being delivered through a $150 million public-private partnership involving Colorado State University and Marvel Fusion, withÌýadditionalÌýsupport from the U.S. Department of Energy and other funding sources. The facility was developed by Tetrad Real Estate, designed by architecture and engineering firm SWBR, and is being built by McCarthy Building Companies.Ìý

GroundÌýwas broken on the project in fall 2024. Substantial completion is scheduled for December 2026, with an official openingÌýanticipatedÌýin 2027.Ìý

With the steel frame now in place, construction will shift toÌýenclosureÌýof the building exterior, followed by installation of mechanical,ÌýelectricalÌýand plumbing systems. Crews will then begin the specialized interior build-outÌýrequiredÌýfor high-performance research operations, including cleanrooms, vibration-sensitive laboratories and precision environments needed to support advanced laser equipment.Ìý

Facilities of this type typically require stringent environmental controls toÌýmaintainÌýstable temperature,ÌýhumidityÌýand air quality, while also minimizing vibration and electromagnetic interference that could affect experiments.ÌýThose technical requirements often make research laboratories more complex than conventional academic buildings.Ìý

University officials have said the ATLAS Facility will expand Colorado State’s long-standing leadership in laser and plasma science while creating opportunities for faculty recruitment, studentÌýtrainingÌýand industry collaboration. The projectÌýalso isÌýexpected to attract visiting researchers and federal research partnerships.Ìý

Fusion energy research has drawn increasing international attention in recent years as governments, universities and private companies pursue technologies that could provide large-scale carbon-free power. Laser-based systems are among several approaches under development to achieve controlled fusion reactions.Ìý

Beyond research, the facility is expected to generate economic benefits for the Fort Collins region during both construction and operation. Large capital projects typically support jobs across the design,ÌýengineeringÌýand construction sectors, while new research infrastructure can create longer-term demand for technical talent,ÌýsuppliersÌýand related business activity.Ìý

The topping-out ceremony also highlighted continued momentum on Colorado State’s Foothills Campus, which has become a center for research initiatives tied to engineering, atmospheric science,ÌýenergyÌýand technology.Ìý

Once operational, ATLAS is expected to serve as a flagship asset for the university and a prominent addition to the state’s research infrastructure. Officials say the facility’s combination of scale, technical sophistication and partnerships could make it a significant contributor to scientific discovery for years to come.Ìý

Get more weekly reports and timely updates by subscribing for free atÌýschoolconstructionnews.com/subscribe.

The post Colorado State University Tops Out Advanced Technology Lasers for Applications and Science appeared first on 91ԭƬ.

The post Colorado State University Tops Out Advanced Technology Lasers for Applications and Science appeared first on 91ԭƬ.

]]>
From ‘80s Office Complex to Modern Junior High Campus /2025/10/07/from-80s-office-complex-to-modern-junior-high-campus/ Tue, 07 Oct 2025 18:16:46 +0000 /?p=54274 In Fort Collins, Colo., what was once a dated 1980s office park is now a thriving junior high school campus: Liberty Common School.

The post From ‘80s Office Complex to Modern Junior High Campus appeared first on 91ԭƬ.

The post From ‘80s Office Complex to Modern Junior High Campus appeared first on 91ԭƬ.

]]>
Photo: Strategic overlap in the design and construction process allowed the Liberty Common School project team to deliver the first phase in just 10 months. | Photo Credit (all): Courtesy of Neenan Archistruction

By Shelby Hinchliff

Liberty Common School, Grand Opening
The project offered an opportunity to give junior high students a space uniquely tailored to their needs without the cost or timeline of new construction.

In Fort Collins, Colo., what was once a dated 1980s office park is now a thriving junior high school campus: Liberty Common School. This ambitious adaptive reuse project exemplifies the opportunities of adaptive reuse and shines a light on how we can reimagine spaces to evolve as the community needs them to.

Designed with flexibility, efficiency and student well-being at the forefront, phase one of the new campus officially opened for the 2025-2026 school year. The full school will be completed in time for the 2026-2027 school year.

For Liberty Common, a charter-public school focused on a classical, core knowledge-based curriculum, the project offered an opportunity to give junior high students a space uniquely tailored to their needs without the cost or timeline of new construction. The facility’s location further bolsters the school’s historic role closing achievement gaps for its district’s low-income and minority students, for which Liberty Common School has achieved national recognition.

“We needed a space that would not limit our growth. Having a regulation sized gym, consolidated classroom spaces and a space to support performances and presentations elevates the experience of our students,� said Kathleen Kearney, Liberty Common Junior High School principal and project manager. “Transforming an outdated office building into a fully functional school campus takes a great deal of planning and coordination, but we are so proud of the final product. It was a rewarding experience to revitalize a space in Fort Collins rather than let it go to waste.�

Reimagining space through adaptive reuse

Originally built as part of a suburban office park, the site presented clear challenges and unique potential. With flat, ribbon-windowed architecture typical of its era, the buildings were far from school-ready. But by reconfiguring the interiors, adding a connective structure between them, and completely reworking the site layout, the design team created a secure, efficient and inspiring learning environment.

The two existing buildings will house classrooms and administrative areas. A new addition, referred to as the “loggia� in a nod to Roman architectural tradition — will connect the structures and includes a regulation-sized gymnasium, multi-use cafeteria and a space to host concerts, musical-theater practice and presentations.

Parking areas will be replaced with green space, providing outdoor learning and recreation areas while supporting critical stormwater rerouting infrastructure.

Fast-tracked timeline and phased construction

Charter school construction typically requires 14-15 months for permitting, design and buildout. But strategic overlap in the design and construction process, along with a highly collaborative approach, allowed the team to deliver the project’s first phase in just 10 months, from design start to occupancy.

Phased approaches are beneficial to many different spaces, but especially critical for schools. In order to prevent any academic disruptions, Neenan and Liberty Common completed phase one, 19,000 square-feet of academic classrooms and administrative areas, in time for the 2025 school year. Phase two will include a second building, loggia, gymnasium, support spaces, specialty classrooms and site work.

With critical areas of the school fully operational, Neenan is working in lockstep with the school to coordinate daily activities. This high caliber of collaboration is needed to ensure student safety in the areas adjacent to an active construction site.

Navigating complexity with collaboration

Liberty Common School, Classroom
By reconfiguring the interiors, adding a connective structure between them, and completely reworking the site layout, the design team created a secure, efficient and inspiring learning environment.

Converting the office park into a school wasn’t just a matter of design. It also required navigating multiple layers of local and state approval. The teams worked with the City of Fort Collins to remove a public street between the two buildings, reroute stormwater systems and reconfigure vehicle access and parking.

The project remained on schedule thanks to close coordination among Neenan, the school, the city and the owner’s representative, Jeff Jensen.

“Because we’ve worked with Liberty for years, we were able to help them quickly weigh their options, support the financing package and push through approvals efficiently,� said Bill Pigg, president of Neenan Archistruction. “This project is a perfect example of how design-build can accelerate delivery without sacrificing quality.�

Planning with purpose

Prior to selecting the site, Liberty Common considered multiple options, including a ground-up build and adaptive reuse of other properties.

Site selection is a critical component of setting up an adaptive reuse project for success. It is necessary to conduct a comprehensive evaluation. Ultimately, Liberty Common selected this site based on proximity to existing campuses, cost efficiency and design flexibility. Neenan supported the funding agreement by helping the school develop its financing package and understand the full lifecycle value of the adaptive reuse model.

Liberty Common School was an opportunity to translate the school’s classical academic philosophy into its physical environment. Architects worked to incorporate traditional design references while optimizing the functionality of a modern school. Classrooms were built with adaptability in mind, supporting future growth.

A model for charter school innovation

The Liberty Common Junior High stands as a proof-of-concept for adaptive reuse in K-12 education. This is especially impressive within the charter sector, where limited budgets and tight timelines are common.

By leveraging Neenan’s integrated design-build model, strong municipal relationships and deep understanding of charter regulations, Liberty Common gained a cost-effective, future-ready campus in record time.

Shelby Hinchliff is a Principal Architect at Neenan Archistruction.

The post From ‘80s Office Complex to Modern Junior High Campus appeared first on 91ԭƬ.

The post From ‘80s Office Complex to Modern Junior High Campus appeared first on 91ԭƬ.

]]>