MSU Denver Archives - 91ԭƬ /tag/msu-denver/ K-12 + Higher Education Market Coverage Sat, 29 Aug 2026 21:26:41 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.5 /wp-content/uploads/2026/01/cropped-SCN_favicon-32x32.png MSU Denver Archives - 91ԭƬ /tag/msu-denver/ 32 32 Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý /2026/08/31/fast-tracking-the-future-how-mass-timber-and-p3-delivery-are-shaping-msu-denvers-summit-house/ Mon, 31 Aug 2026 15:19:22 +0000 /?p=55695 ConstructionÌýrecently topped outÌýonÌýMetropolitan State University of Denver'sÌý(MSU Denver)ÌýSummit House, a 12-story student housing development that marks the university's first on-campus residence hall in its 60-year history.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

]]>
As the tallest mass-timber structure in the state, the MSU Denver Summit House will also be a showcase for the design and construction advantages of this highly renewable building material. Photo Credit: SAR+ ArchitectsÌý

By Lindsey Coulter

ConstructionÌýrecently topped outÌýonÌýMetropolitan State University of Denver’sÌý(MSU Denver)ÌýSummit House, a 12-story student housing development that marks the university’s first on-campus residence hall in its 60-year history. Scheduled for completion inÌýsummerÌý2027, the approximately $118Ìýmillion mixed-use development will provideÌýmore thanÌý550 student beds, dining and retail space, and a permanent home for the university’s Classroom to Career Hub.ÌýÌý

Located on the Auraria CampusÌý(also shared with the Community College of Denver and University of Colorado, Denver) andÌýacross from Ball ArenaÌý(home to the Denver Nuggets and Colorado Avalanche sports teams), the project expands affordable housing whileÌýdemonstratingÌýhow mass timber construction can accelerate project delivery and enhance the student experience.

Making aÌýMass TimberÌýStatement

When complete,ÌýSummit HouseÌýwill be the tallest structure on the downtown-adjacentÌýtri-institutionalÌýcampus. As the tallest mass-timber structure in the state, it will also beÌýaÌýshowcaseÌýforÌýtheÌýdesign and constructionÌýadvantages ofÌýthis highly renewable building material.

Ryan Marshall, Superintendent forÌýproject builderÌýPCL Construction, noted that theÌýthoughtful use of mass timberÌýhelped accelerate construction, as manyÌýcomponents could beÌýfabricatedÌýoff siteÌýdown toÌýaÌý1/16-inchÌýtolerance.ÌýBy maximizing panel sizes, the designÌýrequires approximately 25 cross-laminated timber panels per residential floor, with the two podium levels composed of concrete.Ìý

Ìý“I’ve got to tip my hat to our architect and structural designer,Ìýbecause this project wasÌýreallyÌýdesigned around maximizing the capabilitiesÌýand efficienciesÌýof mass timber,” Marshall said.Ìý“”The width of the structure on the dormitory floors is 60 feet,Ìýwhich isÌýthe longestÌý[cross-laminated timber]Ìýpanel you can feasibly ship without it being an astronomical cost.ÌýIn turn,Ìýthat makes for a quick install,Ìýbecause it goes faster and you’re covering more area.”Ìý

While prefabrication speeds construction, itÌýalsoÌýrequiredÌýsignificantly more coordinationÌýwithÌýsupplierÌýMercer Mass TimberÌýduring design.Ìý

“Every penetration in the whole building had to be dialed in,” saidÌýMacy Huffaker, Project Architect with designer SAR+ Architects. “Every light fixture, every shaft, every dimension that they were making out of mass timber had to be locked in a lot earlier thanÌýitÌýwould on something that’sÌýsite built.”ÌýÌý

Martha Nelson, Director of Planning, Design andÌýConstruction for MSU Denver, noted that mass timber wasÌýa good choiceÌýfor helping meet the project’sÌýtimeline andÌýsustainabilityÌýgoals, but also for enhancing student experience, campus identity, marketÌýdifferentiationÌýand long-term institutional value.ÌýÌý

“The most important decision wasn’t choosing mass timber; it was understanding how student housing could advance MSU Denver’s mission to provide a high-quality, accessible and enriching education. Mass timber became one of the ways we delivered on those institutional goals in a sustainable and cost-effective way,â€� Nelson said.

“There’s plenty of data showing that students who live on campus perform better academically and stay enrolled at higher rates than those who commute,” added Ben DiazÌýSenior Development Manager withÌýColumbia Ventures, which serves as the project’sÌýdeveloper.Ìý“We’re proud to bring students for a true on-campus college experience, and we hope this project is the first of manyÌý—Ìýhelping shift the Auraria campus from a commuter campus to an active, live-in community that blurs the line between downtown and the university.â€�ÌýÌý

Solving Urban ConstructionÌýChallenges

While mass timber and early collaborationÌýhelpedÌýaccelerate the building’s timeline, constructingÌýa large-scaleÌýresidence hallÌýjustÌýoffÌýdowntown DenverÌýrequiredÌýcareful logistical planning.

“One thing that was definitely a concern when I got the project wasÌýfiguringÌýout if a 60-foot panel could make its way into downtown Denver,” Marshall said. “Just making turns and pulling in can be a challenge.”

Getting all materials to the project site required a significant level of planning, including run-throughs with 60-foot semis and coordination with trucking companies that understood the limitations of oversized loads. The team also head to adhere to curfews enforced within the city limits, which prevented deliveries during rush-hour traffic periods.

Delivering Through Partnership

Innovation and creative problem solving was a theme for the project even down to the funding mechanisms. Columbia Ventures, which serves as the project’s developer, partnered with the Auraria Higher Education Center and MSU Denver on this public-private partnership (P3) structure, which leveraged Auraria’s unique P3 statutory authority that helped accelerate project delivery.ÌýÌý

“From a P3 perspective, we could move at a pace and cost structure that’s hard to achieve through traditional public procurement,â€� said Diaz. “That let us release work quicker and often at a more competitive negotiated rate.â€�Ìý

This strategy was one reason the project was able to moveÌýfrom concept to groundbreaking inÌýjustÌýeight months, which Diaz said is notable for a P3 projectÌýwith multiple stakeholdersÌýand goalsÌýhappeningÌýon such a dynamic campus.ÌýÌý

“Part of our successÌýhere was MSU Denver’s commitmentÌýtoÌýthe project,â€� Diaz said.Ìý“We would not have been able to make itÌýatÌýthat pace without their support in this execution methodology.”

Read more about the project in the Design & Construction issue of 91ԭƬ, available now.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

The post Fast-Tracking the Future: How Mass Timber and P3 Delivery Are Shaping MSU Denver’s Summit HouseÌý appeared first on 91ԭƬ.

]]>
Design + Construction Symposium Tackles Real Challenges with Real Solutions /2026/08/11/design-construction-symposium-tackles-real-challenges-with-real-solutions/ Tue, 11 Aug 2026 18:55:44 +0000 /?p=55582 The 91ԭƬ Design + Construction Symposium brought education leaders, architects, designers, contractors, developers and facilities professionals together Aug. 5 at Denver’s historic Tivoli Turnhalle to examine how evolving needs are reshaping the design and delivery of K-12 and higher education environments.Ìý

The post Design + Construction Symposium Tackles Real Challenges with Real Solutions appeared first on 91ԭƬ.

The post Design + Construction Symposium Tackles Real Challenges with Real Solutions appeared first on 91ԭƬ.

]]>
Moderated by Chuck Amos, CEO ofÌýSchoolBondFinder, the panel featured David J. Henderson,ÌýDeputyÌýChief ofÌýOperations for Cherry Creek School District, and Justin Sinnott,ÌýViceÌýPresident ofÌýCorporateÌýOperations at Erickson-Hall.Ìý
Panelists Erika Ashauer, Human Experience Research Lead for HCM’s PK-12 Studio; Joel Williams, Studio Director at QKA; Guy Grace, vice chair of the Partner Alliance for Safer Schools; and Pat Tackney, Security & Architectural Sales Consultant for McGrory Glass Systems, expanded the traditional definition of school safety beyond access control and security hardware.
Panelists Erika Ashauer, Human Experience Research Lead for HCM’s PK-12 Studio; Joel Williams, Studio Director at QKA; Guy Grace, vice chair of the Partner Alliance for Safer Schools; and Pat Tackney, Security & Architectural Sales Consultant for McGrory Glass Systems, expanded the traditional definition of school safety beyond access control and security hardware.

By Lindsey Coulter

The 91ԭƬ Design + Construction Symposium brought education leaders, architects, designers, contractors, developers and facilities professionals together Aug. 5 at Denver’s historic Tivoli Turnhalle to examine how evolving needs are reshaping the design and delivery of K-12 and higher education environments.Ìý

Held on the Auraria Campus, the event focused on project-driven discussions around student belonging, school safety, community engagement, mass timber, urbanÌýdevelopmentÌýand the increasingly compressed construction schedules facing school districts. The symposium was designed to move beyond broad industry trends and examine real projects and lessons that can be applied to future work.Ìý

Designing for BelongingÌý

The program opened with a keynote from Dr. Drew Coleman, Chief of Schools for Jeffco Public Schools, who challenged attendees to consider the relationship between school environments, studentÌýexperienceÌýand educational outcomes.Ìý

Coleman’s presentation, “Building Belonging: Designing Schools Where Students Feel Safe Enough to Learn and Prepared Enough to Lead,â€� examined how the physical environment can either support or hinder student success. His perspective connected education leadership, schoolÌýcultureÌýand the built environment, reinforcing the symposium’s emphasis on designing schools around the needs of the people who use them.Ìý

The keynote was followed by a district-level perspective from Micah Ali, president of Compton Unified School District. Ali discussed the development of Compton High School and the importance of trust,ÌýcontinuityÌýand community partnerships in delivering major educational facilities projects.Ìý

Born and raised in Compton, Ali played a foundational role in the development ofÌýthe highÌýschool and has extensive experience in land use, development and partnerships aimed at expanding opportunities for students.ÌýHe also is helping guide the district’s upcoming Centennial and Dominguez Hills High School projects.ÌýÌý

The discussion illustrated a broader theme that ran throughout the symposium: successful school construction is not simply about delivering a building, but about creating facilities that reflect community priorities and support long-term educational goals.Ìý

Beyond Safety and SecurityÌý

The morning continued with a design panel examining how safety, security,ÌýbelongingÌýand well-being can coexist in school environments.Ìý

PanelistsÌýErika Ashauer, Human Experience Research Lead for HCM’s PK-12 Studio; Joel Williams, Studio Director at QKA; Guy Grace, vice chair of the Partner Alliance for Safer Schools; and Pat Tackney, Security & Architectural Sales Consultant for McGrory Glass Systems,Ìýexpanded the traditional definition of school safety beyond access control and security hardware. Panelists considered how visibility, privacy, supervision,ÌýcomfortÌýand a sense of belonging can influence the experience of students and staff.Ìý

The discussion reflected a broader shift in school design toward environments that address both physical safety and the emotional and social conditions that help students learn.Ìý

Summit House Provides a Case Study in InnovationÌý

Rather than focusing on mass timber as a standalone innovation, the presentation examined the combination of decisions and partnerships required to make the project possible. Those included material selection, planning, logistics, development and construction delivery.
Rather than focusing on mass timber as a standalone innovation, the presentation examined the combination of decisions and partnerships required to make the project possible. Those included material selection, planning, logistics, development and construction delivery.

After a networking break, the symposium shifted from K-12 schools to higher education and studentÌýhousingÌýwith a case studyÌýonÌýMetropolitan State University of Denver’s Summit House.Ìý

Presented byÌýMartha Nelson, Director of Planning, Design and Construction for MSU Denver; Ben Diaz, Senior Development Manager for Columbia Ventures; Macy Huffaker, Project Architect with SAR+ Architects; Ryan Marshall – Superintendent at PCL Construction,ÌýtheÌýsession, moderated by Leone Dick, Chief of Staff to the Vice President of Administration at MSU Denver,Ìýexplored the planning,ÌýdesignÌýand delivery of MSU Denver’s first residence hall.Ìý

Summit HouseÌýrepresentsÌýa significant milestone for the university and for Colorado construction. The 12-story student residence is being delivered using mass timber and is positioned to become the tallest mass-timber structure in the state. The project also incorporates an urban construction environment and a public-private delivery model. (91ԭƬ)Ìý

Rather than focusing on mass timber as a standalone innovation, the presentation examined the combination of decisions and partnershipsÌýrequiredÌýto make the project possible. Those included materialÌýselection, planning,Ìýlogistics,ÌýdevelopmentÌýand construction delivery.Ìý

The case study also gave attendees a closer look at the increasingly complex role of construction teams working in dense urban environments and managing innovative structural systems.Ìý

Racing the Summer Construction ClockÌý

The symposium concluded its formal program with a panel focused on one of the most persistent challenges in K-12 construction: delivering projects within the limited summer construction window.
The symposium concluded its formal program with a panel focused on one of the most persistent challenges in K-12 construction: delivering projects within the limited summer construction window.

The symposium concluded its formal program with a panel focused on one of the most persistent challenges in K-12 construction: delivering projects within the limited summer construction window.Ìý

Moderated by Chuck Amos, CEO ofÌýSchoolBondFinder, the panel featured David J. Henderson,ÌýDeputyÌýChief ofÌýOperations for Cherry Creek School District, and Justin Sinnott,ÌýViceÌýPresident ofÌýCorporateÌýOperations at Erickson-Hall.Ìý

Dubbed “The Summer Sprint,â€� the discussionÌýaddressedÌýplanning, coordination, riskÌýmanagementÌýand project delivery during the period when schools are vacant but must be ready for students when the new academic year begins.Ìý

Henderson brought more than 25 years of K-12 construction andÌýfacilitiesÌýleadership to the discussion, including oversight of approximatelyÌý2 million square feetÌýof capital improvement,ÌýconstructionÌýand renovation projects across Colorado school districts.ÌýSinnott contributed experience in project planning, execution, risk management and operational efficiency.Ìý

The panel underscored how compressed schedules are placing greater emphasis on early planning,ÌýcoordinationÌýand delivery strategies that can reduce risk whileÌýmaintainingÌýquality.Ìý

The topic also reflected broader pressures facing districts nationwide. 91ԭƬ recently examined the “Summer Sprintâ€� as an increasingly demanding period in which districts must complete everything from HVAC replacements and classroom renovations to larger capital projects before students return.Ìý

From Conversation to Job SiteÌý

Attendees also had the opportunity to take the morning’s discussion into the field with an exclusive tour of MSU Denver’s Summit House.
Attendees also had the opportunity to take the morning’s discussion into the field with an exclusive tour of MSU Denver’s Summit House.

Attendees alsoÌýhad the opportunity to take theÌýmorning’sÌýdiscussion into the field with an exclusive tour of MSU Denver’s Summit House.Ìý

The tour provided a firsthand look at the mass-timber residence hall and connected the project’s planning and delivery discussion with its physical construction. According to 91ԭƬ, the projectÌýrepresentsÌýthe intersection of student housing demand, urban development, innovativeÌýmaterialsÌýand alternative approaches to project delivery.Ìý

Across its sessions, the symposium emphasized a common challenge facing both K-12 and higher education: making increasingly complex capital investments serve long-term institutional and community goals.Ìý

From Coleman’s examination of belonging to Ali’s discussion of community trust, the design panel’s exploration of safety and well-being, Summit House’s innovative delivery and the final panel’s focus on compressed construction schedules, the event demonstrated that the future of educational construction will require collaboration across disciplines.Ìý

Rather than treating design, construction, operations and educational outcomes as separate considerations, the symposium brought those perspectives together around a shared question:ÌýHow can the industry create schools and campuses that are not only built successfully, but equipped to serve the people and communities who depend on them?Ìý

The post Design + Construction Symposium Tackles Real Challenges with Real Solutions appeared first on 91ԭƬ.

The post Design + Construction Symposium Tackles Real Challenges with Real Solutions appeared first on 91ԭƬ.

]]>