91ԭƬ

San Diego City College Performing Arts Project Enters Schematic Design Phase

The new center will be a modern, flexible venue capable of accommodating a range of performances and events, supporting both campus programming and broader community use.Ìý
The new center will be a modern, flexible venue capable of accommodating a range of performances and events, supporting both campus programming and broader community use. | Photo Credit: Sundt Construction
  • TheÌýSan Diego Community College District’sÌýSaville Performing Arts Center Replacement project at San Diego City CollegeÌýhas moved into the schematic design phase.Ìý
  • The project will replace the existing Saville Theatre with a new performing arts facility of aboutÌý28,000 square feetÌýdesigned for academic programs and community use.ÌýÌý
  • Scope includes demolition, hazardous materials abatement, utilityÌýrelocationÌýand upgrades, plus site improvements including new walkways and ADA-compliant paths of travel.Ìý
  • The work is part of the Measure HH Bond Program, approved in November 2024, totalingÌý$3.5 billion.Ìý

SAN DIEGO —ÌýThe Saville Theatre Replacement ProjectÌýatÌý, part of the district’s Measure HH Bond Program,ÌýhasÌýofficially movedÌýfrom the programming phase into schematic design.ÌýThe project will replace the existing Saville Theatre with a new,Ìýapproximately 28,000-square-footÌýperforming arts facility designed to support academic programs and community use.

The new center will be a modern, flexible venue capable of accommodating a range of performances and events, supporting both campus programming and broader community use.ÌýTheÌýprogrammingÌýprocess brought togetherÌýfacultyÌýandÌýstaffÌýmembers, whoÌýjoined theÌýDesign-Build team ofÌýÌýandÌýÌýforÌýa series of workshops and discussionsÌýto help shape the project vision, offering insights onÌýinstructional needs,Ìýroom configurations, andÌýhowÌýto bestÌýsupport teaching,ÌýlearningÌýand live performance.ÌýÌý

WorkÌýwill includeÌýthe abatement, demolition, and removal of the existing Saville Theatre and the removal and replacement of associated site utilities and appurtenances in alignment with the campus’s Master Plan.ÌýNew construction of approximately 20,000 assignable square feet (ASF) includes a street-level lobby with Box Office, restrooms, and manager’s office. AÌýmewÌýmain theatre will include 250–350 seats, including stage, orchestraÌýpitÌýand control room as well as a scene shop and costume shop. Other support spaces include rehearsal rooms, recording/editingÌýspacesÌýand dance studios.ÌýÌý

Planned exterior work also includes new walkways, sustainable landscaping and irrigation, signageÌýand ADA-compliant paths of travelÌýthat will connect to a future outdoorÌýamphitheatre.Ìý

“We are honored to continue our partnership with the San Diego Community College District (SDCCD) on this important project,â€� said Ryan Nessen,ÌýSeniorÌýViceÌýPresidentÌýand CaliforniaÌýDistrictÌýManager, according toÌýa press release from Sundt Construction.ÌýÌý

“This selection reflects the trust we have built over more than two decades and our commitment to delivering high-quality facilities that serve students and the broader community,â€� NessenÌýadded.Ìý

Measure HH, approved in November 2024, is aÌý$3.5 billionÌýbond program that will provideÌýstate-of-the-artÌýeducational facilities, address long-deferred maintenance needs, and support accessibility and equity across the district’s colleges.Ìý

The project team also includes structural engineering firm KPFF, civil engineer Latitude 33, and mechanical and electrical engineer MA Engineers/Johnson Consulting Engineers.Ìý

Share this article